Event Date: November 18, 2019

Purpose: Evaluating the status of field work on projects fields out at River Garden Farms.


Field drainage structures that will be installed into each of the special eight, half-acre project field plots.
Picture of the field drainage structures that will be installed into each of the special eight, half-acre project field plots.

Evaluating the field modifications done by mid-November to prepare the project sites.
Rachelle Tallman (UC Davis), Wilson Xiong (UC Davis), Jacob Montgomery (CalTrout), Jennifer Kronk (CalTrout) and Dominic Bruno (River Garden Farms) evaluating the field modifications done by mid-November to prepare the project sites.

The excavator used to pick up, move and install the special drainage structures for the project.
The excavator used to pick up, move and install the special drainage structures for the project.

Video of the excavator used to pick up, move and install the special drainage structures for the project.

Video of the project team discussing with Dominic Bruno (River Garden Farms) plans for the installation of the drainage structures to maximize fish passage and collection by the project team in special fyke nets.

The project team discussing with Dominic Bruno about the installation of the drainage structures
The project team discussing with Dominic Bruno (River Garden Farms) about the installation of the drainage structures to maximize fish passage and recapture during the course of the project.