Skip to content

Event Date: Mid-November 2019

Purpose: Overall field preparation activities (all shot from a drone).


Preparation of the eight special field plots about halfway through field preparation activities.
Preparation of the eight special field plots about halfway through field preparation activities.

Video montage of nearly all types of ground work performed to prepare the field plots.

Trenching work  in the field plots
Trenching work that was conducted both for field drainage and for temperature and predator refugia for the fish to use once they were introduced into the field plots.

Field plots nearly completed.
Picture of the field plots nearly completed.